Order Now:
|
MasterFormat by '04 Divisions: |
||
| Item: | Price: | |
| MF04#: 311000 SITE CLEARING |
MF95#: 02230 SITE CLEARING |
$120.00 |
| Description: Clearing, grubbing, vegetation protection, topsoil stripping, and disconnecting utilities. |
||
| MF04#: 312000 EARTH MOVING |
MF95#: 02300 EARTHWORK |
$120.00 |
| Description: Excavating, filling and backfilling, compaction, and grading. |
||
| MF04#: 312319 DEWATERING |
MF95#: 02240 DEWATERING |
$120.00 |
| Description: Construction dewatering and groundwater controls. |
||
| MF04#: 313116 TERMITE CONTROL |
MF95#: 02361 TERMITE CONTROL |
$120.00 |
| Description: Control by treatment of soil with termiticides, installation of bait stations to dispense termiticides, and installation of permanent metal mesh barriers. |
||
| MF04#: 315000 EXCAVATION SUPPORT AND PROTECTION |
MF95#: 02260 EXCAVATION SUPPORT AND PROTECTION |
$120.00 |
| Description: Soldier piles and lagging, sheet piling, and tiebacks. |
||
| MF04#: 316213 CONCRETE PILES |
MF95#: 02457 PRESTRESSED CONCRETE PILES |
$120.00 |
| Description: Driven precast prestressed concrete piles, solid and hollow. |
||
| MF04#: 316216 STEEL PILES |
MF95#: 02458 STEEL H PILES |
$120.00 |
| Description: Driven steel H-section piles. |
||
| MF04#: 316219 TIMBER PILES |
MF95#: 02459 TIMBER PILES |
$120.00 |
| Description: Driven preservative-treated round timber piles. |
||
| MF04#: 316223 COMPOSITE PILES |
MF95#: 02456 CONCRETE-FILLED STEEL PILES |
$120.00 |
| Description: Driven concrete-filled steel shell and steel pipe piles. |
||
| MF04#: 316329 DRILLED CONCRETE PIERS AND SHAFTS |
MF95#: 02466 DRILLED PIERS |
$120.00 |
| Description: Dry-installed and slurry-displacement-installed types. |
||
Order Now

